Our showrooms are OPEN THIS HOLIDAY SEASON!
closing only on public holidays

To view our showroom opening hours. CLICK HERE
Previous slide
Next slide
End-To-End Pool Creation

Our 12-Week Pool Process

At Summertime Pools, our highly trained and friendly team are here to support you through the pool buying process. Our expert consultants manage the entire process with you to ensure you have peace of mind and understanding, all the way through.

pool handover
shell delivery
pool drop
swimming pool

First

Sales & Confirmation

01

Expert Advice

During the consultation call, we discuss requirements like shape and color preferences, confirm the location, and schedule a site visit. This ensures thorough preparation for the project.

Site Visit

During the on-site consultation, we assess the site, confirm access, and review delivery requirements. This includes auditing the installation area, mapping structures, confirming pool selection, and finalizing quote inclusions.

02

03

Proposal & Quote

We discuss water selection preferences and provide a proposal outlining pool details, equipment, and installation costs. Additionally, we confirm the chosen pool color for the final quote.

Contracts

We confirm the barrier location, finalize the site plan, complete the contract, and proceed with the deposit.

04

05

Permit Application

We review titles, overlays, and site covenants to confirm construction limitations before proceeding with engineer design and computation. This ensures compliance with regulations and informs our planning process efficiently.

Site Preparation

Customers are responsible for organizing services, removing impediments, planning landscaping, and arranging asset protection at the location.

06

07

Order Confirm

We confirm the construction start date and proceed with ordering the pool shell in the chosen color along with selected equipment.

Second

Build & Install

pool construction construct digging

08

Construct

Site establishment includes excavation, pool digging, equipment preparation, barrier erection, and excavation inspection.

fibreglass pool delivery

09

Shell Delivery

After positioning the shell and equipment, installing the stabilise backfill, while filling the pool with water and connecting the equipment for operational readiness.

bond beam

10

Bond Beam

The structural bond beam is boxed and the structural steel is installed. After the inspection concreate is poured, completing the bond beam ready for paving. The site is then cleaned ready for practical completion and hand over to the customer.

Third

Ready for Summertime!

11

Handover

The final pool cleaning includes water balancing, manual handover, customer training, operation run-through, and care and maintenance education.

12

Swim!

The completion of coping tiles is followed by the installation of a permanent barrier.

Ongoing

Customer Service

The customer support hotline handles operational queries, maintenance inquiries, and servicing requests.

lifebuoy float summer swimming

Find Your Dream Pool

Explore our range of fiberglass pools, thoughtfully designed to suit all types of Australian backyards. From sleek and modern designs to timeless classics, there’s a Summertime Pool for every style and preference.